The recent actions by our ISP and their total lack of intrest or effort to fix the problem lead to the switch earlier than was planned. Originally the switch wasn't scheduled until late January.
I hope you bear with us during the transfer. The sites affected by the transfer are AfterDawn.com, Dawnload.net, cd-rw.org, MP3Lizard.com, Blasteroids.com and the associated.forums
Written by: Jari Ketola @ 23 Dec 2003 8:52